[1]Sato K, Hiramatsu K, Hiroshige I, et al. Tube hydroforming technology with controllable moving dies[A]. Japanese Spring Conference for the Technology of Plasticity[C].Japan, 2006. [2]Manabu W, Masaaki M, Keinosuke I, et al. Large-expansion hydroforming technology achieving three-times expanding[J]. Procedia Engineering,2014,81:2217-2222. [3]Zadeh H K, Mashhadi M M. Finite element simulation and experiment in tube hydroforming of unequal T shapes[J]. Journal of Materials Processing Technology, 2006, 177(1-3):684-687. [4]苑世剑, 王小松. 内高压成形机理研究及其应用[J]. 机械工程学报, 2002, 38(S1):12-15.Yuan S J,Wang X S. Developments in researches and applications of tube hydroforming[J].Chinese Journal of Mechanical Engineering, 2002, 38(S1):12-15. [5]温华典,肖小亭,陈颖,等.对三通管支管成形高度影响因素的探讨[J].材料科学与工艺,2010,18 (Z1): 12-18.Wen H D, Xiao X T, Chen Y, et al. The influencing factors of branch height in T-shaped tube hydroforming[J]. Materials Science and Technology, 2010,18 (Z1):12-18. [6]章凯,肖小亭,温华典,等.轴向加速度对单侧双排四通管内高压成形规律的影响[J].机床与液压,2012,40(21):26-28.Zhang K, Xiao X T, Wen H D, et al. Influence of axial acceleration on hydroforming rule for unilateral fourway tube[J]. Machine Tool & Hydraulics, 2012,40(21):26-28. [7]刘静,黄卫良,李霄,等.单双层U形不锈钢波纹管液压胀形变形特征对比研究[J]. 锻压技术,2016,41(5):24-28.Liu J,Huang W L,Li X,et al. Comparative study on deformation behavior of single and bilayered Ushaped stainless steel bellows in hydroforming [J]. Forging & Stamping Technology,2016,41(5):24-28. [8]朱明清,吉卫喜,张旭,等.钛T型管液压成形的工艺参数研究[J]. 锻压技术,2015,40(1):56-60.Zhu M Q,Ji W X,Zhang X,et al. Research on technological parameters of hydroforming for titanium Tshaped tube[J]. Forging & Stamping Technology,2015,40(1):56-60.
|